Available documents
Review of supplied mechanical drawings, equipment schedules, commissioning figures or authority correspondence relevant to the requested assessment.
Measured airflow, mechanical ventilation observations and written findings for commercial kitchens with poor capture, odour complaints, altered equipment or an investigation request.
The exact scope is agreed before attendance. We combine relevant measurements with observations of the equipment and conditions that can affect commercial kitchen exhaust performance.
Review of supplied mechanical drawings, equipment schedules, commissioning figures or authority correspondence relevant to the requested assessment.
Readings at agreed points, recorded with the system operating state and test conditions so the results have useful context.
Visible smoke or fume escape, canopy performance symptoms and obvious changes to the cooking load or equipment arrangement.
Obvious pressure and replacement-air issues that may affect doors, odour movement, fan performance or canopy capture.
Relevant fan condition, VFD speed, starters, operating commands and connected interlocks within the agreed mechanical and electrical scope.
Measured results, observed defects, scope limitations and practical repair, replacement or further-assessment recommendations.
An assessment can help establish the next step when a system has changed, performance is disputed or the cause is not obvious.
We identify the concern, equipment, requested evidence and documents available for comparison.
Agreed airflow readings and equipment observations are recorded under the available operating conditions.
The report separates measurements, observed defects, assumptions and limitations from recommendations.
Repair, replacement, further testing or specialist engineering work is identified where required.
AS 1668.2 contains provisions relevant to mechanical ventilation and commercial kitchen exhaust. However, the edition and compliance pathway for a particular site depend on its approval, design documents and the authority or certifier involved.
Where approved drawings or commissioning criteria are available, measured results can be compared with that information. A later edition of a Standard does not automatically replace the basis of an existing approval.
“Thai was friendly, explained the issues we had and everything that needed to be done. He is very knowledgeable in his field. I would absolutely recommend Altruism!”Helen B · Google review
No. Testing records measurements and observations for the agreed scope and conditions on the day. Whole-building certification may require approved design information and assessment by an appropriately qualified engineer, certifier or authority.
Where available, send approved mechanical drawings, specifications, previous commissioning results, equipment schedules, council or certifier correspondence and details of the issue being investigated.
We can still record agreed measurements and observed conditions. Without approved design criteria, the report will clearly state the limits on comparison and may recommend engineering or document retrieval as the next step.
It covers an agreed multi-fan assessment and written report. The equipment, access, requested measurements and reporting scope are confirmed beforehand. Additional or specialist testing is quoted separately where required.
Yes. Where the required work falls within our mechanical and electrical service scope, repair or replacement options can be quoted separately. Engineering, certification or specialist cleaning is referred out where appropriate.
No. Altruism NSW does not provide canopy, filter or duct cleaning. Those services should be completed by a specialist commercial kitchen exhaust cleaning contractor.
Tell us what is happening, who requested the report and what drawings or previous results are available.